Guide
What a grounds maintenance contract should include
A checklist for anyone reviewing or retendering a grounds contract. Use it to compare contractors on the same points.
The specification: areas, visits, standards
Most complaints about a grounds contract start with a vague specification. A phrase like tidy as required means something different to every reader.
A good specification answers three questions. What is maintained? How often does the team visit? What standard is each task kept to?
Start with a plan of the site. Mark every lawn, bed, hedge, path and car park in the contract. Mark what is left out too, such as private gardens or land a neighbour owns.
Then set the visit pattern by season. Grass grows from spring to autumn, so visits are closer together then. Our contracts are typically fortnightly in the growing season and four-weekly in winter, adjusted to the site.
Last, write a standard for each task. A standard you can check on a walk round is worth more than a long task list. The list below shows what to pin down.
- Grass: the height it is kept to, and whether clippings are collected or returned to the lawn.
- Edges: how often they are cut. Monthly and every visit give very different results.
- Beds and borders: weeded every visit, or on a planned rotation written into the contract.
- Hedges: how many cuts a year, timed outside bird-nesting season.
- Weeds on paths and car parks: treatments a year, and how much weed cover is acceptable.
- Leaves: which areas are cleared first in autumn, and where the leaves go.
- Litter: picked on every visit, and from which areas.
Hedges and the nesting season
Hedge timing deserves its own line. Birds nest in hedges from roughly March to August. Active nests are protected by the Wildlife and Countryside Act 1981.
A contract should schedule the main hedge cuts outside that season. It should also say what happens when a hedge blocks a path or a sight line in summer.
On our contracts, hedges are cut to an agreed schedule outside bird-nesting season. The exception is a safety trim, done after a nest check.
How you will know it was done
A specification only helps if you can see it being met. Ask each contractor what record you receive, and how soon after the visit.
For a managing agent, the test is simple. Can you answer a resident who asks whether the team came, without ringing the contractor?
- A dated record of every visit, with photographs of the finished work.
- A note of any hazard the team spotted, such as loose paving or a broken handrail.
- A regular quality check against the written standard, with a score you can track.
- A record of every herbicide treatment: what was applied, where and when.
- One place to find all of it, so you can forward a report to a board.
Paperwork to ask for, and people
Ask for the documents before the contract starts. A contractor who has them will send them without fuss.
Accreditation schemes vary. We hold SafeContractor. Some agents and facilities teams ask for a different scheme, so check which one your own approved list requires.
Then ask who will be on site. Some contractors employ their own teams and some subcontract the work. Either can work, but you should know which you are buying.
Ask whether the same team attends each visit. A team that knows the site spots what has changed. Ask for one named contact at the office too.
- RAMS: risk assessments and method statements written for your site.
- COSHH assessments for every product used on the site.
- PA1 and PA6 certificates for anyone applying herbicide.
- Public liability and employer's liability insurance certificates, in date.
- Health and safety accreditation, such as SafeContractor.
Price, extras, term and gritting
A fixed annual price is the easiest to budget and to compare. Ask how it is invoiced. Ours is invoiced in twelve equal monthly payments.
Ask how the price changes each year, and get the method in writing. Ours is a transparent, index-linked annual review citing published figures. It happens on the contract anniversary, and we send the working two months ahead.
Next, define extra work. Every contract has limits, and a good one lists them. Typical exclusions are tree work at height, storm clearance, fly-tipping, replacement planting and structural repairs.
Ask how extras are priced, and insist that nothing is done without your agreement first. On our contracts, extra work is priced separately and agreed with you beforehand.
Check the minimum term and the notice period. Ours run for a minimum of twelve months, then continue. Either side can end the contract with two months' notice.
On residential blocks, a contract longer than twelve months can trigger leaseholder consultation. Your managing agent can advise on that.
Ask how handover works at the start and at the end. A new contractor should walk the site and agree a start date. We handle the handover from your current contractor.
Finally, gritting. Many grounds contractors do not grit or clear snow, and we are one of them. If your current contract has a gritting clause, check who will cover it. It often needs a separate winter contractor.
On a managed site
Our grounds maintenance contracts are set up along these lines. The work is done by our own directly employed team, with a dedicated contact at the office.
You get a photo report after every visit, in your client portal. RAMS, COSHH assessments and insurance documents are kept there too.
You can choose one of three service levels. If you already have a specification, send it and we will price to that.